$ 2 500 000 | 5195, Rue St-Hubert, APP. , Montréal (Le Plateau-Mont-Royal)

Montréal (Le Plateau-Mont-Royal)

MLS : 14770319




Bedrooms

No. of Bathrooms

Powder Rooms



Demander plus de renseignements

Presented by

Maha El Keshawi Maha El Keshawi
Real Estate Broker
CONCORDIA IMMOBILIER INTERNATIONAL

T: 514-965-9292
F:514-495-9387
mahaelk@gmail.com
http://www.immobilierconcordia.com

ELEMENTS OF PROPERTY

Year Built: 1944

Building type: Attached

Building size: 43.60 x 40.90 p

Lot size: 43.60 x 75.40 p

Lot area: 304.20 sqm

Lot area: 304.20

INCLUSIONS

1 electric water heater - 1 indirect water heater - 8 fridges - 8 stoves - commercial washer and dryer included.

EXCLUSIONS

All tools and materials in the back room are excluded.


Features

Driveway: Asphalt shingles
Heating system: Hot water

Heating system: Radiant
Water supply: Municipality

Heating energy: Natural gas
Available services: Laundry room

Easy access: Escalators
Equipment available: Entry phone

Windows: Aluminum
Foundation: Poured concrete

Proximity: Other
Proximity: Highway

Proximity: Cegep
Proximity: Daycare centre

Proximity: Hospital
Proximity: Park - green area

Proximity: Bicycle path
Proximity: Elementary school

Proximity: High school
Proximity: Public transport

Proximity: University
Siding: Brick

Basement: None
Basement: Separate entrance

Parking: Outdoor
Sewage system: Municipal sewer

Window type: Sliding
Window type: Hung

Roofing: Asphalt shingles
Roofing: Asphalt and gravel

View: City
Zoning: Residential


Addendum

Renovations: - Apartment 1: Kitchen counters and floor 2022-Bathroom Floor 2016-Tub Reglazed 2022- Apartment 2: Electric Heating - Water Tank - Kitchen Cabinetry 2013- Apartment 3: Entire bathroom 2017 - Tub Reglazed 2020- Apartment 4: Kitchen Cabinetry and Floor 2013- Apartment 5: Nothing- Apartment 6: Bathroom Floor 2018 - Kitchen Counter and Floors 2019- Apartment 7: Bathroom Floor 2019 - Shower Walls 2020 - Tub Reglazed 2020 - Kitchen Counter and Floor 2021- Apartment 8: Kitchen Counter and Floor 2019 - Shower Walls 2018All galvanized changed except 1 line for apt 8 bathroom - new 1 inch copper entrance and shutoff - ¾ inch risers - rear bricks repointed 2019 - fire escape mostly replaced over the years - front balconies redone plywood and aluminum railings 2018/2019 - main drain replaced 2016 - new furnace 2014 - new indirect water tank 2015 - Addition of a laundry room (makes about $900/year) commercial Washer and Dryer included - windows and doors replaced before 2013 - new electrical entrance and breaker panels in all apartments changed before 2013