$ 2 399 000 | 5195, Rue St-Hubert, APP. , Montréal (Le Plateau-Mont-Royal)

Montréal (Le Plateau-Mont-Royal)

MLS : 20551405




Bedrooms

No. of Bathrooms

Powder Rooms



About this property

Great investment opportunity! Several renovations carried out. Lots of potential.

Demander plus de renseignements

Presented by

Maha El Keshawi Maha El Keshawi
Real Estate Broker
CONCORDIA IMMOBILIER INTERNATIONAL

T: 514-965-9292
F:514-495-9387
mahaelk@gmail.com
http://www.immobilierconcordia.com

ELEMENTS OF PROPERTY

Year Built: 1944

Building type: Attached

Building size: 43.60 x 40.90 p

Lot size: 43.60 x 75.40 p

Lot area: 304.20 sqm

Lot area: 304.20

INCLUSIONS

1 electric water heater - 1 indirect water heater - 8 fridges - 8 stoves - commercial washer and dryer included.

EXCLUSIONS

All tools and materials in the back room are excluded.


Features

Driveway: Asphalt shingles
Heating system: Hot water

Heating system: Radiant
Available services: Laundry room

Water supply: Municipality
Heating energy: Natural gas

Equipment available: Entry phone
Windows: Aluminum

Foundation: Poured concrete
Proximity: Highway

Proximity: Cegep
Proximity: Daycare centre

Proximity: Hospital
Proximity: Park - green area

Proximity: Bicycle path
Proximity: Elementary school

Proximity: High school
Proximity: Public transport

Proximity: University
Siding: Brick

Basement: None
Basement: Separate entrance

Parking: Outdoor
Sewage system: Municipal sewer

Window type: Sliding
Window type: Hung

Roofing: Asphalt shingles
Roofing: Asphalt and gravel

View: City
Zoning: Residential


Addendum

Renovations: - Apartment 1: Kitchen counters and floor 2022-Bathroom Floor 2016-Tub Reglazed 2022- Apartment 2: Electric Heating - Water Tank - Kitchen Cabinetry 2013- Apartment 3: Entire bathroom 2017 - Tub Reglazed 2020- Apartment 4: Kitchen Cabinetry and Floor 2013- Apartment 5: Nothing- Apartment 6: Bathroom Floor 2018 - Kitchen Counter and Floors 2019- Apartment 7: Bathroom Floor 2019 - Shower Walls 2020 - Tub Reglazed 2020 - Kitchen Counter and Floor 2021- Apartment 8: Kitchen Counter and Floor 2019 - Shower Walls 2018All galvanized changed except 1 line for apt 8 bathroom - new 1 inch copper entrance and shutoff - ¾ inch risers - rear bricks repointed 2019 - fire escape mostly replaced over the years - front balconies redone plywood and aluminum railings 2018/2019 - main drain replaced 2016 - new furnace 2014 - new indirect water tank 2015 - Addition of a laundry room (makes about $900/year) commercial Washer and Dryer included - windows and doors replaced before 2013 - new electrical entrance and breaker panels in all apartments changed before 2013